Construction of Gravity Main Interceptor in Deir El Balah- Stage 1& 2
 

 

Client: UNRWA
Year: 2003-2004
Value: $1,250,000

 
 

SAK has successfully completed Deir El-Balah sewage line project which included about two km length of reinforcedconcrete sewer pipes internally lined with HDPE, the pipes diameters varied between 600mm to 1000mm.
 

The depth of pipes reached 6m depth for more than 15% of the total works.
 

The project also included installing of UPVC pipes for sanitary sewer, the pipes diameter is 400mm, the depth of installation reached 4m at many places. Pre-cast concrete manholes of different sizes were also installed.

 

It is worth to mention that all project concrete pipes and manholes were manufactured by

El-Nasser Company for Concrete Industries which belongs to SAK.