Construction
of Gravity Main Interceptor in Deir El Balah- Stage 1& 2
|
|
Client: UNRWA |
|
|
|
SAK has
successfully completed Deir El-Balah sewage
line project which included about two km length
of reinforcedconcrete sewer pipes internally lined with HDPE, the pipes diameters varied
between 600mm to 1000mm.
The depth of pipes
reached 6m depth for more than 15% of the
total works.
The project also included
installing of UPVC pipes for sanitary sewer, the pipes
diameter is 400mm, the depth of installation reached 4m at many places.
Pre-cast concrete manholes of different sizes
were also installed.
It is worth to mention that all project concrete pipes and manholes were manufactured by El-Nasser Company for Concrete Industries which belongs to SAK. |
|||