Eastern Hebron Bulk Water Supply Project/4A –Pipeline Installation

 

 

Client: USAID
Year: 2004-2006
Value: $4,410,000

 
 

SAK was contracted by USAID for the construction of this project. The work under this project consists of the construction of bulk water transmission pipeline at Hebron, West Bank.

The work shall include, but not limited to the following

 

    • Installing about 29500 m of 500 mm diameter and
       400 mm diameter ductile iron transmission pipeline
       (40 bar working pressure) with all related valves, fittings, and chambers.
    • Supplying and installing about 5000 m of 500 mm diameter welded
      steel transmission pipe line (16 bar working pressure) including fittings and chambers.